NGM Loading Development Round

NGM Meikle-REN UDS

The overall purpose of this contract is to rehab an existing Ren exploration drift near the Meikle Shaft via additional fully encapsulated bolts throughout for longevity of the drift. Additionally, to fully support further exploration and eventual mining activities there is a need to drive a parallel drift (7,000’ of lateral mine development at 20’ x 21’) for the eventual ore exploration/production and ventilation circuit. In the short term this parallel drift will also allow for a primary airflow loop through the area (currently on an exhausting hardline system) that will allow for an increase in airflow and help manage the extreme geothermally influenced heat hazards in the area, as well as provide a secondary means of egress from the area to support future mining. Environmental conditions require chillers and continued monitoring of personnel for heat encountered.

Work scope began rehab bolting through an existing Exploration Drift including clean and re-support areas with 8’ Swellex bolts and wire prior to full installation of grouted and tensioned rehab or hollow bar bolts (8’ through drift, 16’ bolts in intersections and passing bays). As rehab progressed a twin drift to the Exploration was driven to the East of the Ren EXP. It started development from the 3665 Level in Banshee and break through into Ren decline at multiple locations for ventilation continuity.
The project also included the installation of a paste mine backfill system. As part of the Project, the Owner requires that the Paste Distribution system that will supply the paste to all underground areas in the Rodeo and North Post sections of the underground be installed with Engineered supports.

Work consisted of two sections, the Meikle to Extension Run which will require 7 drilled raise boreholes (varying in length from 80’ to 750’), and 6,116 feet of 6-inch piping. The second will be the Banshee to Ren run which will consist of 3 boreholes, and 6,649 feet of piping. Banshee Development consists of drill/blast for 2100’ drift at 17’ x 18’ drift to reach production stopes.

Nevada Gold Mines, Carlin, NV, Meikle Shaft and Ren Decline

Contract Value:

$41.2M

Delivery Method:

Bid Build

Owner:

Nevada Gold Mines

General Contractor:

Drill Tech Drilling & Shoring, Inc.

Project Overview

  • Paste Pipe Summary
    • Down the Ren Ramp
      • 5449 feet of piping
      • Supports
      • Pipe Guides
    • Into the Ren Ramp
      • All other piping listed to 100 feet
      • All other supports listed up to 100 feet
      • All Pipe Guides up to 100 feet
      • All Bolting up to 100 feet
    • All Heavy-Duty Anchors after each Borehole
    • 2- 23X25X50 foot bays
    • All pressure sensors
  • Paste Pipe Bore Hole Summary
    • 2- 118-foot boreholes from M 1075 – M 1225
    • 2- 544-foot boreholes from M 1225 – M 3595
    • 59-foot borehole from X 3595 – X 3525
    • 64-foot borehole from X 3525 – X 3465
    • 64-foot borehole from X 3465 – X 3400
    • 2- 750-foot boreholes from H 4385 – Ren Hole