• Skip to main content
Drill Tech logo
  • Home
  • Services
    • Earth Retention
    • Foundations
    • Ground Treatment
    • SEM Tunneling
    • Rail
    • Architectural Shotcrete
  • About US
    • History
    • Our Team
    • Subsidiaries
    • Clients
    • Industrial Organizations/Associations
  • Equipment
  • Projects
    • Videos
  • Contact
    • Careers
×
  • Home
  • Services
    • Earth Retention
    • Foundations
    • Ground Treatment
    • SEM Tunneling
    • Rail
    • Architectural Shotcrete
  • About US
    • History
    • Our Team
    • Subsidiaries
    • Clients
    • Industrial Organizations/Associations
  • Equipment
  • Projects
    • Videos
  • Contact
    • Careers
Inquiries?
GET IN TOUCH TODAY

SEM Project Videos

Explore a series of videos showcasing various tunneling and excavation projects utilizing the Sequential Excavation Method (SEM). These projects highlight advanced engineering techniques, stabilization processes, and infrastructure development.

Two Mile Bar Tunnel
Play Video

Two Mile Bar Tunnel

Range Front Declines
Play Video

Range Front Declines

Tunnel Stabilization and Sewer Pipeline
Play Video

Tunnel Stabilization and Sewer Pipeline

SCVWD Upper Llagas Creek
Play Video

SCVWD Upper Llagas Creek

Upper Llagas and Anderson Dam
Play Video

Upper Llagas and Anderson Dam

SEM Equipment Videos

Take a closer look at some of the powerful machines that make Sequential Excavation Method (SEM) projects possible.

Anderson Dam Terex TE210
Play Video

Anderson Dam Terex TE210

  • Privacy Policy
  • SMS
footer logo

Home Services About Us Equipment Projects Contact

Visit Us On:

The Top ENR 600 logo

© 2025 DRILL TECH DRILLING & SHORING, INC.