• Skip to main content
Drill Tech logo
  • Home
  • Services
    • Earth Retention
    • Foundations
    • Ground Treatment
    • SEM Tunneling
    • Rail
    • Architectural Shotcrete
  • About US
    • History
    • Our Team
    • Subsidiaries
    • Clients
    • Industrial Organizations/Associations
  • Equipment
  • Projects
    • Videos
  • Contact
    • Careers
×
  • Home
  • Services
    • Earth Retention
    • Foundations
    • Ground Treatment
    • SEM Tunneling
    • Rail
    • Architectural Shotcrete
  • About US
    • History
    • Our Team
    • Subsidiaries
    • Clients
    • Industrial Organizations/Associations
  • Equipment
  • Projects
    • Videos
  • Contact
    • Careers
Inquiries?
GET IN TOUCH TODAY

Drill Tech

This DTDS contract consisted of drilling, setting beams, pouring concrete in wet and dry conditions, installing permanent wood lagging for approximately 2,400 square feet of exposed shoring, 37,490 lineal feet of soil nails with an anchored wire mesh rock slope protection system. Also performed was drilling 85 beams from 15 to 60 feet in length, installed 154 tie-backs in the soldier pile lagged wall and 13,700 Lineal feet of secant pile and tieback shoring at the portals.

  • Privacy Policy
  • SMS
footer logo

Home Services About Us Equipment Projects Contact

Visit Us On:

The Top ENR 600 logo

© 2025 DRILL TECH DRILLING & SHORING, INC.